Search
Showing 1 to 8
| 1. | BEACH NEWS - replenishment complete |
| http://www.harveycedars.org/cn/news/?NID=41173 | |
| website for the LBI Beach Replenishment Project. AUGUST 15, 2016 All beaches in Harvey Cedars are open. Beach replenishment is complete in Harvey Cedars. AUGUST 12, 2016 - 12noon It is anticipated to have beaches closed tomorrow from Hudson south to the border. Work should be completed in HC Saturday night with equipment clean-up on Sunday. AUGUST 12, 2016 Beach is closed south | |
| Relevance: 12.27 | |
| 2. | Flood - Are You Protected |
| http://www.harveycedars.org/cn/webpage.cfm?TPID=16850 | |
| are strong enough to hold the weight. Outside air conditioning compressors and heat pumps are required to be placed on a base above the projected flood elevation. All work must conform to state and local building codes. Does your home have flood vents? Installation of flood vents within the enclosure space below the first floor allows for flood waters to flow through equalizing | |
| Relevance: 7.38 | |
| 3. | Beach Project - October 2016 |
| http://www.harveycedars.org/cn/news/?NID=41895 | |
| removing all fencing on the beach and walkovers. Public Works will replace the walkover post & rail fencing (including private walkovers) after the beach project is completed. Dune fencing will be replaced by Public Works in the spring by May 15th. Hard pack on walkovers will not be replaced at this point but the hard pack (I5) on the Hudson Avenue drive-over will also be replaced | |
| Relevance: 6.14 | |
| 4. | * History * |
| http://www.harveycedars.org/cn/webpage.cfm?TPID=14777 | |
| of worn, sculpturesque pilings projected from the sand parallel to the beach, remnants of jetties built in the 1920s and '30s. For bathers, a half-dozen young men guarded the beach at three locations. The 80th Street beach might be crowded with a hundred people on a big weekend. Teenagers gathered driftwood and had beach parties with blazing fires at night. All that was required was a permit from | |
| Relevance: 4.51 | |
| 5. | ROAD WORK CONTINUES FOR WATERMAIN |
| http://www.harveycedars.org/cn/news/?NID=51056 | |
| A watermain replacement project began on May 11, 2020. The project will start at West 76th Street and the Boulevard and will continue north to West 80th Street in the southbound lane of the Boulevard. Anticipated work is scheduled to begin on May 11th and completed on May 29th for pipe installation. Final paving to be completed no later than June 19th. All work to be done will be weather | |
| Relevance: 3.45 | |
| 6. | Aerial History of Harvey Cedars |
| http://www.harveycedars.org/cn/news/?NID=51622 | |
| leading to the Harvey Cedars Hotel, now the Bible Conference. Follow the white line on top left, a wooden walkway, out the claw-like projection to Woods Island, where a large home was built. The island has totally eroded. All the white sections are sand and surf and the dark sections are green meadows, or marshland. The only place to see what the original bayside of the Island looked like now | |
| Relevance: 3.44 | |
| 7. | Route 72 Bridge Closures Notification |
| http://www.harveycedars.org/cn/news/?NID=46627 | |
| as the Route 72 Manahawkin Bay Bridges project advances. Beginning at 7 a.m., Monday, June 4 NJDOT’s contractor, Schiavone Construction, is scheduled to close a single lane on Route 72 to install steel sheeting to stabilize the slopes around the west abutment to the West Thorofare Bridge between Cedar Bonnet Island and Bonnet Island in Stafford. Working hours will be from 7 a.m. until 9 p.m. Monday | |
| Relevance: 2.77 | |
| 8. | Zoning Office |
| http://www.harveycedars.org/cn/webpage.cfm?TPID=16490 | |
| ; Fax: (609)361-6031 cmorillo@harveycedars.org Office Hours: 9 am to 11 am Wednesday & Friday Thinking of starting a new project? A call to the Zoning Officer | |
| Relevance: 2.36 | |

